Aluminium Form Work

High Concrete Pouring Rate Aluminium Alloy Formwork Product Description Speed of construction, 3 days per floor construction cycle. Formwork can be re-used over 300 times. No tower cranes required to lift the formwork from floor to floor, as the formwork is light weight. Very high quality of finish, so good that walls only need a 3 to 5mm skim or putty coat plaster to achieve a perfect finish. No heavy backing plaster. Externally, a good quality textured paint applied provides a high quality finish, again no plastering required. Ceramic tiling can be fixed directly unto the formed concrete finish, again no plastering required to straighten the walls. We offer a complete redesign service of your formwork into your next project maximizing the number of re-uses.